Gujarat Solar Subsidy – Extra Benefits on PM Surya Ghar, Cut Electricity Bills Permanently

Gujarat residents, here’s permanent big relief from rising electricity bills in 2026! Under the enhanced PM Surya Ghar Muft Bijli Yojana, Gujarat offers additional state subsidies on rooftop solar installations – up to ₹30,000 extra for 1-3 kW systems on top of central benefits. A 3 kW setup can generate 400+ units monthly, leading to zero or negative bills via net metering in sunny cities like Ahmedabad, Surat, Vadodara, Rajkot, and Gandhinagar. Install now for lifelong savings and energy independence.

Know Complete Details

Gujarat leads in solar adoption with Suryagujarat scheme integrated into national PM Surya Ghar. Central subsidy remains ₹78,000 max (₹30,000/kW for first 2 kW + ₹18,000/kW next), while state provides:

  • ₹15,000 per kW for 1-3 kW systems (up to ₹30,000 extra)
  • For low-income/PM Suryodaya beneficiaries: Higher boosts possible
  • Net metering: Excess generation credited at ₹2.25-3.50/unit or adjusted in future bills
  • Applies to residential rooftop only via GUVNL DISCOMs (PGVCL, DGVCL, MGVCL, UGVCL)
Also Read  Rajasthan Power Relief 2026: 150 Units Free Electricity Via Solar – Know Application Details Now

Over 5 lakh installations targeted in 2026, with streamlined online approvals.

How Much Benefit/Relief/Savings

High sunshine (5-6 kWh/m²/day) makes Gujarat ideal – quick payback.

System SizeApprox Cost (Before Subsidy)Central SubsidyGujarat ExtraNet Cost to YouMonthly Generation (Avg)Annual Savings (at ₹5-7/unit)
1 kW₹50,000-60,000₹30,000₹15,000₹5,000-15,000130-160 units₹8,000-12,000
2 kW₹90,000-1,10,000₹60,000₹30,000₹0-20,000260-320 units₹18,000-25,000
3 kW₹1,40,000-1,70,000₹78,000₹30,000₹32,000-62,000390-480 units₹25,000-35,000+

Many achieve zero bills + earn from excess (payback 2-4 years, 25-year life).

How It Affects You

  • Urban homes (Ahmedabad, Surat): Offset AC-heavy summer usage.
  • Rural areas: Ample roof space, reliable power during outages.
  • Middle-class families: Permanent cut in monthly expenses.
  • Environment: Reduce carbon footprint, contribute to Gujarat’s renewable targets.
Also Read  Delhi Water Bill Surcharge 100% Waiver – Pay Principal by March 31 to Save Lakhs

Tips to Avoid Trouble – Application Details

  • Register on national portal pmsuryaghar.gov.in → Select Gujarat DISCOM.
  • Or use state Suryagujarat portal for extra subsidy claim.
  • Upload Aadhaar, electricity bill, roof photo.
  • Choose DNV-empanelled vendor for quality.
  • Post-install: DISCOM inspection, net meter – subsidy in 30-60 days.
  • Low-interest loans available via banks.
  • Track status online; avoid unregistered vendors.

Have you planned solar installation yet? How much permanent savings do you expect on bills in 2026?

Comment below and share your views!

Stay updated with us for all latest solar subsidies, GUVNL rules, and power updates in 2026.

Official Website Links:

Also Read  Karnataka Free Power Scheme 2026: Gruha Jyoti Up to 200 Units Zero Cost – Check Eligibility Today

Leave a Comment